Solar power designed to how your house actually uses electricity

Turnkey photovoltaic systems for family houses and small businesses anywhere in the Czech Republic. We read your electricity bill, survey the roof, size panels and battery to your consumption, and handle the grid operator paperwork, installation, inspection and the state support programme, in English.

Freedesign and site survey
24 hoursfirst reply on working days
Whole countryvetted local installation crews
Installers fitting a solar panel on a family house roof

Who we build for

Solar panels on a clay tile roof of a family house

Family houses

Systems of 3 to 15 kWp with a battery, optionally with water heating and preparation for a heat pump or an electric car. Sized from your annual bill and from when you are at home.

  • hybrid inverter and battery sized for evening consumption
  • connection request with ČEZ Distribuce, EG.D or PREdistribuce
  • documents for the 2026 interest-free loan scheme (Nová zelená úsporám)
Rows of solar panels on the flat roof of a commercial building

Businesses

Workshops, warehouses, offices, guesthouses and shops: daytime operation matches solar production best. Designed from the 15-minute meter data your grid operator already holds.

  • systems up to 100 kWp on flat and pitched roofs, export limitation
  • main breaker, reserved capacity and roof statics assessment
  • production monitoring and service

How it works

Consumption review

Send your annual bill and a few words about the house. We return a first estimate.

1 to 2 days

Site survey

Roof, covering, shading, switchboard and supply. Free of charge.

within 2 weeks

Design and quote

Panel layout, capacity, battery, itemised quote and monthly yield estimate.

within a week

Grid connection request

We file with the distributor and prepare the support scheme documents.

statement usually within a month

Installation

Mounting, panels, inverter, battery, switchboard. Clean-up and training.

1 to 3 days

Inspection and start-up

Inspection report, meter exchange, connection protocol, monitoring app.

depends on the operator

Questions we get from expats

Can a foreigner get the Czech state support for solar?

The Nová zelená úsporám programme is open to natural persons who own the house, regardless of nationality. In 2026 mainstream households receive an interest-free loan rather than a grant; a direct grant remains for low-income households. We prepare the paperwork, including the mandatory renovation passport.

Do I need a building permit for rooftop solar?

Rooftop systems on family houses up to 50 kW generally need neither a permit nor notification, unless the building is listed or the structure is altered. We check this with the local building office before designing.

How long does the whole process take?

Installation itself takes one to three days. The grid operator's statement on the connection request usually arrives within a month; after installation there is an inspection and a meter exchange. Expect several weeks to a few months in total.

Send us your bill, we will send back a design

Your annual consumption and a photo of the roof are enough to start. We reply within 24 hours on working days and arrange a free site survey. No obligation.

Thank you. We will get back to you within 24 hours on working days to go through your consumption and arrange a site visit.
Sending failed. Please call 775 654 443 or write to [email protected].

Prefer to call?

English spoken. Working days.

775 654 443

[email protected]

  • Design based on your real consumption, not a catalogue kit.
  • Free roof and switchboard survey.
  • Grid operator and support scheme paperwork handled for you.
  • Installation by a vetted crew from your region, inspection and handover with documentation.