Fotovoltaika na míru / Companies

Solar PV for businesses and commercial premises

Daytime operations are ideal for photovoltaics: generation occurs precisely when machinery, cooling systems and offices consume power. We design based on real data from the electricity meter.

For which businesses

Production halls and workshops, warehouses and logistics centres, retail outlets and supermarkets, guesthouses and hotels, offices, agricultural buildings, residential blocks with shared consumption. They all share the fact that consumption occurs during daylight hours and the roof is available. It pays off most where cooling or air conditioning is in use: the highest summer afternoon demand coincides with peak generation.

Photovoltaic panels on a flat roof of an industrial hall
Flat roof of the hall: tilted construction, rows oriented east and west for smoother production throughout the day.

How we design a commercial solar power plant

What is included in the offer

Panel layout on the roof, installed capacity, estimated monthly annual generation versus your consumption, share of direct consumption, itemised breakdown of components and works, schedule and list of administrative steps including who signs what. For subsidy programmes for businesses (OP TAK, Modernisation Fund), we will verify open calls and prepare the technical part of the application. Programmes 2026

Service and operation. After commissioning, we monitor production via the monitoring system and carry out an inspection after the first year. Power plant inspections are repeated at intervals according to the facility's operating regulations; we keep track of the dates for you.

Frequently Asked Questions for Companies

How large a photovoltaic system does the company need?

We design commercial power plants using 15-minute interval data from the electricity meter available to the distributor and based on the weekly operational schedule. The aim is to maximise direct consumption of generated power within the facility. We often limit grid feed-in for businesses because the buy-back price is low and the distributor may impose conditions on the connection.

Can the hall's flat roof support the panels?

The structural load from the panels ranges in tens of kilograms per square metre. For older halls and lightweight roofs, a statician assesses the load-bearing capacity and selects a light anchored structure instead of a ballasted one. This assessment is part of the preparation and not an additional item.

How long does connecting a commercial solar power plant take?

The connection application is submitted to the distributor along with the project documentation; the utility network statement usually arrives within a month. For higher output capacities, the distributor may require modifications to the connection or limitations on power feed-in. The entire process from enquiry to commissioning typically takes several months.

Related services

Send your supply point number and annual consumption; we will return an operational proposal.

We only need your annual consumption and type of operation; we will request the fifteen-minute data ourselves. We will contact you within 24 hours on working days to arrange an inspection of the roof and the switchgear room.

Thank you. We will contact you within 24 hours on working days to review your consumption and schedule an inspection appointment.
Sending failed. Please call us on 775 654 443 or write to us at [email protected].

Prefer to call?

Call on working days; we will go through it together in ten minutes.

775 654 443

[email protected]

  • The design is based on your actual consumption, not a catalogue package.
  • Free technical inspection of the roof and distribution board.
  • We will handle the connection request with the distributor and prepare the documentation for the New Building Unit (NZÚ).
  • Installation by a trusted local team, inspection and handover with documentation.